|
Take-up re-coiling process |
The MT88 is equipped with a unique take-up system. The rope is wound up on a reel with a large take-up capacity. When full, the reel is taken out by use of a crane, and fitted on a separate pay-off stand ready for recoiling. An empty reel is replaced in the MT88. Production is resumed immediately after the exchange of the reels while the rope on the full reel, placed on the separate pay-off stand, is re-coiled on ready-to-sell coils on the separate coiling machine C1444. The entire reel change operation is carried out in app. 5 minutes.
|